River Oaks VTA HQ Campus | San Jose, CA

Redevelopment of VTA HQ Campus into Transit-oriented Development

Description

The River Oaks Vision Plan reimagines the 17.45-acre VTA HQ into a mixed-use development with affordable and market rate housing, retail and office buildings. The Plan calls for 310 affordable housing units, 785 market rate units, approximately 330,000 S.F of office space and 21,000 S.F. of retail space. A diagonal pedestrian mews connects the River Oaks Light Rail Station to the Central Tree Courtyard with existing mature Oak trees. The new 3.3-acre Riverfront Park serves as an extension of Riverview Park on the adjacent parcel.

Proximity to the Light Rail Station and a well-connected network of mews and pathways and open spaces creates a vibrant and walkable neighborhood and encourages transit ridership. The impact of parking is greatly reduced by lining them with residential or commercial uses along the pedestrian realm.

Transit-oriented Development Design features

  • Pedestrian-oriented urban design and building forms
  • Corner plaza at main building entry adjacent to the Light Rail Station
  • Over 5 acres of public open space with a 3.3-acre Riverfront Park along Guadalupe River
  • Mixed-use, mixed-income community
  • Transit Oriented Community

Project information

Client: VTA

Site area: 17.45 acres

Density: 1095 units – 104 DUA

Completion: Jan 2026

 


Transit-Oriented Development (TOD)

Our transit-oriented developments combine mixed-use and infill development with pedestrian-friendly streets close to public transportation. These comprehensive plans create lively villages that inspire people to buy locally, use more public transit and drive less. Our TOD projects have included land use plans and urban design guidelines, master plans for new mass transit station areas, and infill visions for park-and-ride lots. VMWP also works with municipalities to develop implementation strategies as well as guidelines with which to evaluate development proposals.

 

Van Meter Williams Pollack LLP